BAYCARE HEALTH SYSTEM
St. Joseph’s Hospital- Medical Office Building Master Plan
Project Details
Square Footage: 73,000 sqft - 90,000 sqft
Responsibility: Planning and programming, master planning, campus visualization
BayCare Health requested master planning
services to develop options to site medical office buildings on their dense St. Joseph’s Hospital in Tampa, Florida. The medical office buildings options were centered around three primary criteria:
• Available land on the existing
campus
• Area required to satisfy physician
needs
• Required parking to support gross
square footage
Attributes of the existing campus were
studies to support the final design solutions
including:
• campus access and mobility
• campus density
• existing easement and corridors
• green space
• view corridors
• campus gateway / image
The three preferred options include: solution for a substantial addition to the existing medical arts building, new construction along eastern campus gateway including MOB and structured parking, phased new construction on adjacent under developed parcel.
* Work performed while with another firm.
MIXED USE OFFICE BUILDING MASTER PLAN/STUDY
Project Details
Cost: $350 - $550mil
Square Footage:
64,000 sqft commercial
260,000 sqft medical office
600,000 sqft Institutional ( Hospital)
Responsibility: planning , design
and ROM estimating services
BayCare Health system requested master
planning services for a new campus in SE
Pasco County , Florida. The campus consist
of multiple parcels totaling 54 acres with an additional parcel set aside for a campus partner. The master plan was developed within an existing DRI and explored different scenarios of commercial, medical office and Hospital uses to satisfy the development order.
The preferred master plan first phase consists of 50k sqft of medical office and 40k of commercial square footage. Phase two added two more 50k sqft medical office buildings.
Phase three added two more 40k sqft medical office building and phase four added 16k sqft of commercial space as 30ksqft f medical office buildings.
Phase five depicted a 600ksqft Hospital
building constricted in to, 300k sqft
phases with structured parking and
commercial space.
The campus demonstrated ‘destination
healthcare’ with all of the buildings being
situated in a walk-able public realm
* Work performed while with another firm.
Copyright 2016 Chapuis Design Group Architecture, pa