Palm Beach Gardens Medical Center – OR 10 Renovation
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase services for the removal and demolition of existing equipment in OR 10 and the installation of similar equipment in the OR. This includes light booms, utilities booms and medical gas booms. The project was design in close coordination with the Hospital surgical…
Palm Beach Gardens Medical Center – ED Lobby and Results Pending Renovation
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase services for the multi phase renovation of the front-of-house of the existing emergency department. The new design allows for a ‘results pending’ multi patient space to allow the patients to wait for the results of their tests without being in a patient…
Palm Beach Gardens Medical Center – OR 5 – Boom Install and Renovation
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase services for the installation of vendor booms into the existing OR 5 space. The booms, when installed, will allow the utilities to be more neatly stored and delivered to increase patients care and staff member efficiency. Additionally, the booms proved to be…
Palm Beach Gardens Medical Center – XRAY Equipment Changeout
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase services for changing our existing x-ray equipment. The project includes the change out of the equipment as well as finish upgrades to flooring and wall and new casework and doors.
Palm Beach Gardens Medical Center – Endo Decontamination Renovation
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase services to renovate the existing decontamination and sterilization track for the endoscopy rooms at the Facility. The track included decontamination and sterilization in one room with cross-flows. The new plan included new counters, sinks and equipment as well as adjustments to walls…
Palm Beach Gardens Medical Center – Hyrbid OR Renovation and Addition
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase services for the addition and renovation to the existing operating suite at the Hospital. By combining to existing operation rooms and adding space to the department, the new Hybrid operating room and support space adds another high acuity modality to the existing…
Palm Beach Gardens Medical Center – Interventional Radiology Renovation
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase service to change out an existing piece of interventional radiology equipment. The new equipment provides updated hardware and software and increased patient care in the existing footprint. Casework and finishes were also upgrades to provide a clean and fresh look.
Palm Beach Gardens Medical Center – 2nd Floor Finishes Upgrade
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase services for the refresh of the existing second floor patient unit to align with the latest design standards. Patient rooms were refreshed and updated the floors, walls and ceilings as well as updated new to ne headwalls. The patient restroom were also…
Palm Beach Gardens Medical Center – Nuclear Med Equipment Changeout
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase services for the equipment change of existing nuclear medicine equipment in a multi-machine space. The new machine had different electrical requirements so electrical was upgrades as well as door finish, flooring, walls and casework.
Palm Beach Gardens Medical Center – Cath Lab Equipment Changeout
Palm Beach Gardens Medical Center requested CDG to provide design and construction phase service for the change out of an existing piece of Cath lab equipment. The project included the updates to the Cath lab procedure room, control room and adjacent support spaces as well as new casework and finishes throughout.