PALM BEACH GARDENS MEDICAL CENTER – EP lab replacement
Palm Beach Gardens Medical Center requested the design and construction phase servcies for the renovation of their existing cath lab to an EP Lab. The new EP lab changes the way in which services are provided in that all of the srevices have been moved form the floor and floor boxes to suspended ceiling booms…
PALM BEACH GARDENS MEDICAL CENTER – MRI Replacement
Palm Beach Gardens Medical Center requested the design and construction phase services for the upgrade of an existing 1.5T Magnet to a new 3T magnet in their existing MRI space. The existing magnet was not self shielded and so large amounts of steel had to be removed for the de-installation of the existing magnet and…
ADVENT HEALTH – TAMPA – Cath Lab Equipment change out
Advent Health – Tampa: Pepin Heart Hospital requested the design and construction phase services for the replacement of one of their existsing cath labs. Pepin Heart Hospital is predominantly a GE equipment institution, therefore, we changed out an existing GE lab for a new GE lab. Additionally the Team upgraded some of the existing electrical…
PALM BEACH GARDENS MEDICAL CENTER – CT Replacement
Palm Beach gardens Medical Center requested the design and construction phase services of the CDG team for the installation of a new CT machine. The machine replaces and end-of-life machine and keeps the services Palm Beach Gardens offers running smoothly. The new layout includes effecient flow from corridor , to staging , to scan and…
FISCHBACH LAND COMPANY – Brandon Ambulatory Surgery Center
CDG was asked to provide design and construction phase services for this new, ambulatory surgery center located in Brandon, Florida. This new center was designed to be an effecient healthcare environment, capable of providing surgical and endoscopic service to a variety of patients. The facility is the largest in the HCA portfolio of surgery centers…
ADVENT HEALTH – ORLANDO Linear Accelerator
Advent Health – Orlando cancer Center requested the design and construction phase service for a technically challenging renovation of one of their existing linear accelerators. The existing machine was at its end of life and no longer provided the cutting edge diagnostics Advent Health has come to expect. The new machine was placed in a…