HEART OF FLORIDA – Outpatient Rehabilitation suite renovation
Advent Health – Heart of Florida requested the design and construction phase services for the renovation and expansion of their existing outpatient rehabilitaion space in their on-campus outpatinent building. The project saw the expansion and upgrade of the existsing space to include many more pieces of rehabilitation equipment including steppers, rowers and circuit-type equipment as…
PALM BEACH GARDENS MEDICAL CENTER – EP lab replacement
Palm Beach Gardens Medical Center requested the design and construction phase servcies for the renovation of their existing cath lab to an EP Lab. The new EP lab changes the way in which services are provided in that all of the srevices have been moved form the floor and floor boxes to suspended ceiling booms…
PALM BEACH GARDENS MEDICAL CENTER – MRI Replacement
Palm Beach Gardens Medical Center requested the design and construction phase services for the upgrade of an existing 1.5T Magnet to a new 3T magnet in their existing MRI space. The existing magnet was not self shielded and so large amounts of steel had to be removed for the de-installation of the existing magnet and…
ADVENT HEALTH – TAMPA – Cath Lab Equipment change out
Advent Health – Tampa: Pepin Heart Hospital requested the design and construction phase services for the replacement of one of their existsing cath labs. Pepin Heart Hospital is predominantly a GE equipment institution, therefore, we changed out an existing GE lab for a new GE lab. Additionally the Team upgraded some of the existing electrical…
PALM BEACH GARDENS MEDICAL CENTER – CT Replacement
Palm Beach gardens Medical Center requested the design and construction phase services of the CDG team for the installation of a new CT machine. The machine replaces and end-of-life machine and keeps the services Palm Beach Gardens offers running smoothly. The new layout includes effecient flow from corridor , to staging , to scan and…
ADVENT HEALTH – ORLANDO Linear Accelerator
Advent Health – Orlando cancer Center requested the design and construction phase service for a technically challenging renovation of one of their existing linear accelerators. The existing machine was at its end of life and no longer provided the cutting edge diagnostics Advent Health has come to expect. The new machine was placed in a…
AdventHealth – Dade City – Pre/Post OP Suite Renovation
Advent Health -Dade City requested the design and construction phase service for this complex, multi-phased renovation of their existing Pre and Post operative patient care space. The project included renovation around many existing spaces which were required to remain in service during the duration of the project. The Hospital had a clear vision to raise…