PALM BEACH GARDENS MEDICAL CENTER – EP lab replacement
Palm Beach Gardens Medical Center requested the design and construction phase servcies for the renovation of their existing cath lab to an EP Lab. The new EP lab changes the way in which services are provided in that all of the srevices have been moved form the floor and floor boxes to suspended ceiling booms…
PALM BEACH GARDENS MEDICAL CENTER – MRI Replacement
Palm Beach Gardens Medical Center requested the design and construction phase services for the upgrade of an existing 1.5T Magnet to a new 3T magnet in their existing MRI space. The existing magnet was not self shielded and so large amounts of steel had to be removed for the de-installation of the existing magnet and…
PALM BEACH GARDENS MEDICAL CENTER – CT Replacement
Palm Beach gardens Medical Center requested the design and construction phase services of the CDG team for the installation of a new CT machine. The machine replaces and end-of-life machine and keeps the services Palm Beach Gardens offers running smoothly. The new layout includes effecient flow from corridor , to staging , to scan and…
ADVENT HEALTH – ORLANDO Linear Accelerator
Advent Health – Orlando cancer Center requested the design and construction phase service for a technically challenging renovation of one of their existing linear accelerators. The existing machine was at its end of life and no longer provided the cutting edge diagnostics Advent Health has come to expect. The new machine was placed in a…